DrillLogs

For mines running their own rigs

Your drilling record, made at the rig and approved by your people.

For drill departments running their own rigs. Hiring drilling contractors too? See contractor management.

Rig budget vs actual: Monthly metre budget vs actual per rig, July to October, with months not yet budgeted
Rig budget vs actual

What your drilling superintendent gets

A shift nobody can quietly change

Someone other than the submitter approves it. Then it's locked; reopening takes an admin and a reason. Both names print on the PLOD.

Problems come to you

Overlapping depths, wedge kick-off errors and core loss longer than the run are flagged for review and block approval until they're settled. Mis-dated shifts and double-booked rigs or crews are flagged too.

Budget vs actual, per rig, per month

Paste the corporate budget grid. “Never budgeted” is kept apart from “budgeted zero for demob”.

Month-end, without the spreadsheet

What your GM asks you on the 5th of the month

Metres per rig against budget, daily and cumulative metres, holes drilled, hours by category with downtime and standby, crew attendance and fuel per metre: out as a PDF or Excel management report from the shift record. Bit life, stock on site and progress against plan sit on screen beside it.

Management report, PDF or Excel
Management report, PDF or Excel

For the geologist overseeing the program

Programs, holes and planned depths, with boundaries and collars on a map.

Downhole surveys, CSV import, and a progress forecast against plan.

Duplicate holes merged without losing history; wedges without double-counted metres.

Programs and holes on a map: Program boundaries and a site on the map
Programs and holes on a map
Plan vs actual by program: Planned vs actual depth per program
Plan vs actual by program
Alerts queue: Open alerts on the shifts you review
Alerts queue

Map imagery: tiles © Esri. Source: Esri, Maxar, GeoEye, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AeroGRID, IGN and the GIS User Community. Map library: Leaflet.

More for mines

Your contractor's invoice, checked line by line

Upload the contractor's own PDF. Each line is matched to the shifts you approved, even when the contractor doesn't use DrillLogs.

Notes read against the numbers, and a month-end summary

AI reads the drillers' notes against what was logged, and a summary links every figure to its shifts. It flags; you decide.

See invoice checking on a demo →

Start with one rig

Eight weeks, one rig, one program, alongside your paper PLOD for the first two weeks, across one month-end. Success criteria are agreed before day one. The pilot is paid.

Honest limits

Your client gets a read-only view. Tablet: Android, English and French.